Monday, March 3, 2008
Moving along...
We lost the weekend due to weather, but today we resumed with some work inside. They added stairs and began bracing the interior walls. The metal straps are hurricane straps to help with wind sheer. They are also going to plywood the interior walls on the top 2 floors to help stiffen the structure. This is an added measurement being that we are very exposed to the strong windows blowing across the bay. The stairs make a big difference and change the look and feel of the house.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment