Monday, July 28, 2008

Insulation and Drywall.




It was all hands on deck today. The insulation passed inspection yesterday and now the drywall team is attacking it. To watch a professional drywall team is almost like watching a professional baseball team. They can tear through massive amounts of square footage in hours. I was there for 2 hours in the morning and the entire downstairs was almost done. We even had the president / GC / All around hard worker; Ron Meier, up on the ladder hanging the Speakercraft speaker brackets. It really feels like there is light at the end of the tunnel. I hope we keep progressing this quickly until the end.

Sunday, July 27, 2008

The Siding is almost complete!




I stopped by the house this week and was excited to see the siding basically done. The cedar went up last week and looks great. It still needs to be stained and the underside will get soffit, but everything is starting to come together.

Kerf Design Kitchen Factory Tour.




Well it has been a really long time since I lasted posted. We had some major siding problems and lost 4+ weeks. I am happy to report that the siding is just about finished. A couple neighbors have called and said that it look great. I am going there on Tuesday to see it and I will update the photos. Last week I was in Seattle and I went to see our kitchen designer. It was great! He is in a little spot along the water in Seattle, WA. It looks like a great place to work everyone brings their dogs into work with them. He set up the kitchen so that I can could see it. They are finishing the vanities next week and it will be shipped. We are very excited to get it installed. It is going to be great!